Send inquiry
    
Model Number: MST-161203-24
Key Specifications/Special Features:
Automatic lathe machine produced partsPlease refer to the table below:
		
			
Advantages(1). Competitive price with good quality(2). Low MOQ (100pcs is even acceptable in some special conditions)(3). Short lead time (7-30days according to order QTY)(4). Customized size and spec/OEM available
(5). At Qingdao, convenient transportation
(6). ISO9001:2008 certification
 Packing 
First layer: Eco-friendly pp bag packaged,
Second layer: EPE Foam packaged for protecting the products.
Third layer: Carton boxes or wooden boxes.
We also can pack as customer's specific requirements to avoid damaging,
suitable for sea and air transportation or as required 
 
Delivering
and
delivery time 
(1).0.1kg-150kg Best choice is By Express. We have account of UPS and FedEx.
(2). Heavy goods: by sea is available
(3). We can also deliver as client’s requirement
(4). 7-30days after receiving payment/deposit 
 
 Factory 
Specialized in CNC machining. Brother factories provide us anodizing, electro plated and surface finishes and more.
Well-credit with 12 year experience. 
 
Machines and
equipment 
1. 15 CNC lathes
2. 17 auto-lathes
3. 9 punching equipment (largest one is 315T)
4. Many other auxiliary equipment like drilling tapping, polishing and grinding machines and more.
5. Measurement tools by quadratic programming and whole sets of QC tools
6. Assembly lines 
 
(5). At Qingdao, convenient transportation
(6). ISO9001:2008 certification
Second layer: EPE Foam packaged for protecting the products.
Third layer: Carton boxes or wooden boxes.
We also can pack as customer's specific requirements to avoid damaging,
suitable for sea and air transportation or as required
and
delivery time
(2). Heavy goods: by sea is available
(3). We can also deliver as client’s requirement
(4). 7-30days after receiving payment/deposit
Well-credit with 12 year experience.
equipment
2. 17 auto-lathes
3. 9 punching equipment (largest one is 315T)
4. Many other auxiliary equipment like drilling tapping, polishing and grinding machines and more.
5. Measurement tools by quadratic programming and whole sets of QC tools
6. Assembly lines
Shipping Information:
- FOB Port: Qingdao
 - Lead Time: 30 - 45 days
 
Main Export Markets:
  - Eastern Europe
 - North America
 - Mid East/Africa
 - Central/South America
 - Asia
 - Western Europe
 - Australasia
 
