Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-31 13:11
196
Company Profile
By certification [File Integrity]
Contact:highlingdredger(Ms.)
Email:
Telephone:
Area:Beijing
Address:No. 01599, Xiangjiang West Street, Advanced Manufactur Industrial Park, Binhai Economy Development Zone, Weifang, Shandong, China (261108)
| H500 | |
| Dredger LOA | 36.0m |
| Hull size(L×B×H) | 27.0×8.5×2.5m |
| Main pontoon(L×B×H) | 15.4×3.5×2.5m |
| Side pontoon (L×B×H) | 24.0×2.5×2.5m |
| Structure | Can be dismantle and re-assemble easily ,box structure, lower delivery cost |
| Main engine brand & power | 895kW |
| Auxiliary engine brand& power | 298kW |
| Harbour generator | 40kW |
| Dredging pump | Warman Technology |
| Discharge pipe inner Dia.. | 500mm |
| Head | 54m |
| Max. dredging depth | 15m |
| Water flow | 4000m/h |
| Solid sand capacity | 800m/h |
| Discharge distance | 2000m |
| Cutter head Dia. | 1700mm |
| Cutter power | 170kW |
| Draught | 1.7m |
| Displacement | 302T |
| Hydraulic control system | PLC |
| Wire rope pulling force (Lifting winch )*Quantity | 80kn *1 |
| Wire rope pulling force (Traversing winch )*Quantity | 80kn *2 |
| Operation room | adjustable chair, movable side-window, air condition, PLC system, signal lights and floodlights |
| Total weight | 180T |
| Total power | 1233kW |
| Total fuel oil consumption | 179L/H |